Abu Qir power station
The process of restoring the outputs of units 1-5

  •  Establishing a temporary barrier (gates) and completely drying the water inside the facility.
  •  Breaking and removing all concrete covering of all walls of the structure above and below the water level and the external sides of the structure.
  • Replacing all worn-out iron with new iron and planting chemabox markers to stabilize the new iron and restoring the concrete cover in accordance with
    For engineering specifications and measurements.

Year: 3122
Work location: Abu Qir Power Station
Subject of the contract: Restoration of the water outlet of units 5 – 2
Duration of contract implementation: 4 months
Client name: West Delta Electricity Production Company

Before
During
After
Before
During
After

During Work

After Work